Essential work will be carried out on the bridge on Monday 21 February and Tuesday 22 February and due to the narrow road width over the bridge it will need to be closed on both days for the safety of public and staff working on site.
The parapet on the Tiverton side of the structure needs to be repaired after being damaged by a vehicle.